UAE Projects - Work progress for Job 251 at 19/02/2014 : - Up to 19th floor slab was cast. - 19th to 20th floors columns and core walls are in progress. - Reinforcement steel works for columns and core walls at 19th to 20th floors are completed 60%. - Block work at 11th and 12th floors are in progress, 25% of block works is completed. - Block work layout at 13th floor is in progress. - Plaster work at 4th floor is in progress, 20% completed. - Plaster preparation for 5th and 6th floors are in progress. - MEP first fix for upto 10th floor walls... UAE Projects - Work progress for Job 502 at 16/02/2014 : - OVER ALL PERCENTAGE OF WORK COMPLETED - 92.85% - MEP WORKS - 99.02 - ALUMINUM-WORKS - 96.78% - INTERIOR DESIGN-GREEN LINE - 80.05 CIVIL WORKS JOINERY WORKS - 100% EXTERNAL MARBLE WORKS - 95% CERAMIC WORKS - 100% PAINTING WORKS - 100% - HOTEL & SERVICES LIFTS – OTIS - 100% Project Details UAE Projects - Work progress for Job 256 at 13/02/2014 : - OVERALL PROGRESS 24.72% - SUBSTRUCTURE 95% GROUND FLOOR - COLUMNS 95% - SLAB 5% - BLOCK WORK 0% - PLASTER 0% - FALSE CEILING 0% - ALUMINUM 0% - MEP 1% Project Details UAE Projects - Work progress for Job 248 at 09/02/2014 : - Over all progress: 76.44% - SUB-STRUCTURE WORK 99.08% - MEP WORK 71.8% Ground Floor Ground Floor Columns 98.7% Ground Mezz. 90.9% First Floor Slab & Beams 97.5% First Floor First floor Columns 97.0% First Mezz. 83.3% Roof Slab & Beams 93.5% Ground Floor Block work 92.6% Plaster work 85.3% Floor Ceramic 55.6% False Ceiling 42.5% First Floor Block work 77.5% Plaster work 43.2% - Steel Structure at roof 81.5% Project Details UAE Projects - Work progress for Job 242 at 18/01/2014 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - Wardrobes works have been completed. - Kitchen cabinet installation are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters are completed. - Testing / commissioning of... UAE Projects - Work progress for Job 502 at 16/01/2014 : - OVER ALL PERCENTAGE OF WORK COMPLETED - 92.85% - MEP WORKS - 97.5% - ALUMINUM-WORKS - 96.78% - INTERIOR DESIGN-GREEN LINE - 67.2% CIVIL WORKS - JOINERY WORKS - 100% - EXTERNAL MARBLE WORKS - 95% - CERAMIC WORKS - 100% - PAINTING WORKS - 100% - HOTEL & SERVICES LIFTS - OTIS - 100% Project Details UAE Projects - Work progress for Job 246 at 14/01/2014 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 252 at 11/01/2014 : - Over all progress : 37.78% - SUB-STRUCTURE WORK 99% - MEP WORK 54.3% Ground Floor - Ground Floor Columns 48.8% - First Floor Slab & Beams 24.4% First Floor - First floor Columns 6.6% - Roof Slab & Beams 4.4% Ground Floor - Block work 1.3% - Plaster work 0% - Floor Cermaic 0.0% - False Ceiling 0% First Floor - Block work 0% - Plaster work 0% - Steel Structure at roof 0% Project Details UAE Projects - Work progress for Job 248 at 09/01/2014 : - Over all progress: 73.34% - SUB-STRUCTURE WORK 99.05% - MEP WORK 63.27% Ground Floor - Ground Floor Columns 98.7% - Ground Mezz. 90.9% - First Floor Slab & Beams 97.5% First Floor - First floor Columns 97.0% - First Mezz. 83.3% - Roof Slab & Beams 93.5% Ground Floor - Block work 91.8% - Plaster work 83.8% - Floor Cermaic 40.1% - False Ceiling 12% First Floor - Block work 70.2% - Plaster work 16.8% - Steel Structure at roof 81.3% Project... حاكم الشارقة يتفقد سير العمل في إنشاءات الجامعة القاسمية - 29/12/2013 : نقلاً عن جريدة الخليج قام صاحب السمو الشيخ الدكتور سلطان بن محمد القاسمي عضو المجلس الأعلى... UAE Projects - Work progress for Job 251 at 19/12/2013 : - Upto 15th Floor slab was cast. - 15th to 16th floor columns and core walls are in progress. - Reinforcement steel works for columns and core walls at 15th to 16th floor are completed 100%. - Block work at 8th and 9th floor are in progress, 50% of block works is completed. - Block work layout at 10th floor is in progress. - Plaster work at 2nd floor is in progress, 60% completed. - Plaster preparation for 3rd floor is in progress. - MEP first fix for 5th floor walls are in progress. Project... UAE Projects - Work progress for Job 242 at 18/12/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - Wardrobes works have been completed. - Kitchen cabinet installation are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters are completed. - Testing / commissioning of... UAE Projects - Work progress for Job 246 at 14/12/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete)... UAE Projects - Work progress for Job 248 at 9/12/2013 : Over all progress: 69.78% SUB-STRUCTURE WORK 99% MEP WORK 54.3% Ground Floor Ground Floor Columns 98.7% Ground Mezz. 90.9% First Floor Slab & Beams 97.5% First Floor First floor Columns 97.0% First Mezz. 83.3% Roof Slab & Beams 93.5% Ground Floor Block work 91.3% Plaster work 79.9% Floor Cermaic 30.0% False Ceiling 8.5% First Floor Block work 59.6% Plaster work 9.2% Steel Structure at roof 69.8% Project Details UAE Projects - Work progress for Job 251 at 19/11/2013 : - Upto 14th Floor slab was cast. - 14th to 15th floor columns and core walls are in progress. - Reinforcement steel works for columns and core walls at 14th to 15th floor are in progress, completed 20%. - Block work at 7th and 8th floor are in progress, 75% of block works is completed. - Block work layout at 9th floor is in progress. - Plaster work at 1st floor is in progress, 60% completed. - Plaster preparation for 2nd floor is in progress. - MEP first fix for 3rd floor walls are in progress. Project... UAE Projects - Work progress for Job 242 at 18/11/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - Wardrobes works have been completed. - Kitchen cabinet installation are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters are completed. - Testing / commissioning of... UAE Projects - Work progress for Job 246 at 14/11/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork... UAE Projects - Work progress for Job 248 at 09/11/2013 : Over all progress: 65.47% SUB-STRUCTURE WORK 98.3% MEP WORK 44% Ground Floor Ground Floor Columns 98.3% Ground Mezz. 90.9% First Floor Slab & Beams 97.3% First Floor First floor Columns 96.0% First Mezz. 83.0% Roof Slab & Beams 88% Ground Floor Block work 89.0% Plaster work 79.0% Floor Cermaic 8.0% False Ceiling 2.0% First Floor Block work 11.6% Plaster work 9.0% Steel Structure at roof 53.0% Project Details UAE Projects - Work progress for Job 251 at 19/10/2013 : - Upto 11th Floor slab was cast. - 11th to 12th floor columns and core walls were cast by 80%. - Shuttering for 11th floor slab completed by 100%. - Reinforcement steel works for columns and core walls at 11th to 12th floor are in progress, completed 90%. - Block work at 5th and 6th floor are in progress, 75% of block works is completed. - Block work layout at 7th floor is in progress. - Plaster preparation for 1st floor is in progress. - MEP first fix for 1st floor walls are in progress. UAE Projects - Work progress for Job 242 at 18/10/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - Wardrobes works have been completed. - Kitchen cabinet installation are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters are completed. - Testing / commissioning of... UAE Projects - Work progress for Job 502 at 16/10/2013 : OVER ALL PERCENTAGE OF WORK COMPLETED - 91.66% MEP WORKS - 96.31% ALUMINUM-WORKS - 95.79% INTERIOR DESIGN-GREEN LINE - 52.15% CIVIL WORKS JOINERY WORKS - 100% EXTERNAL MARBLE WORKS - 68% CERAMIC WORKS - 100% PAINTING WORKS - 99.5% HOTEL & SERVICES LIFTS - OTIS - 96.98% Project Details UAE Projects - Work progress for Job 246 at 14/10/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete)... UAE Projects - Work progress for Job 247 at 11/10/2013 : RCC Works – 100%. Masonry Works – Block & Plaster works completed 100%. Ceramic Works Painting Works Marble works Ground Floor – 100%. 63.33%. 95%. First Floor – 100%. 80.00%. 95%. Second Floor – 95%.... UAE Projects - Work progress for Job 248 at 09/10/2013 : Over all progress: 57.88% SUB-STRUCTURE WORK 98.2% MEP WORK 29.1% Ground Floor Ground Floor Columns 98.4% Ground Mezz. 90.9% First Floor Slab & Beams 95.9% First Floor First floor Columns 94.5% First Mezz. 72.7% Roof Slab & Beams 65.3% Ground Floor Block work 86.8% Plaster work 46.4% First Floor Block work 29.8% Project Details UAE Projects - Work progress for Job 251 at 19/09/2013 : - 9th Floor slab cast on 10th August’ 2013. - 9th to 10th floor columns and core walls were cast by 100%. - Shuttering for 10th floor slab completed by 100%. - Reinforcement steel works for slab is in progress, completed 50%. - Post tension works for 10th floor slab is in progress. - MEP first fix for 10th floor slab is in progress. - Block work at 4th and 5th floor are in progress, 75% of block works is completed. - Block work layout @ 6th floor is in progress. - Plaster preparation... UAE Projects - Work progress for Job 242 at 18/09/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - Wardrobes works have been completed. - Kitchen cabinet installation are in progress. About 95% of works are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters are completed. -... UAE Projects - Work progress for Job 502 at 16/09/2013 : - OVER ALL PERCENTAGE OF WORK COMPLETED - 91.33% - MEP WORKS - 95.64% - ALUMINUM-WORKS - 95.70% - INTERIOR DESIGN-GREEN LINE - 49.09% - JOINERY WORKS - 99% - MARBLE WORKS - 91% - CERAMIC WORKS - 100% - PAINTING WORKS - 97.8% - HOTEL & SERVICES LIFTS - OTIS - 96.5% Project Details UAE Projects - Work progress for Job 505 at 15/09/2013 : ZONE 2 Gysum Board-False Ceiling 20% External Primer 100% Plaster (Internal -External ) 90% GRC works 90% MEP WORKS-2 nd fix 80% Wall tiling Works 70% Piling Works 100% Excavation around Piles 60% ZONE 1 Plaster (Internal -External ) 60% Wall tiling Works 55% MEP Works -2nd Fix... UAE Projects - Work progress for Job 246 at 14/09/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor... UAE Projects - Work progress for Job 247 at 11/09/2013 : RCC Works – 100%. Masonry Works – Block & Plaster works completed 100%. Ceramic Works Painting Works Marble works Ground Floor – 100%. 63.33%. 90%. First Floor – 100%. 80.00%. 90%. Second Floor – ... UAE Projects - Work progress for Job 248 at 09/09/2013 : - Over all progress: 52.69% - SUB-STRUCTURE WORK 98.2% - MEP WORK 21.1% Ground Floor - Ground Floor Columns 98.2% - Ground Mezz. 90.9% - First Floor Slab & Beams 95.5% First Floor - First floor Columns 89.5% - First Mezz. 65.5% - Roof Slab & Beams 40.3% Ground Floor Block work 78.6% Plaster work 30.0% First Floor Block work 11.6% Project Details UAE Projects - Work progress for Job 242 at 18/08/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - 98% of wardrobes works have been completed. - Kitchen cabinet installation are in progress. About 95% of works are completed. - False ceiling in all typical floors have been completed. - Painting works about 90% completed. - Installation of vanity counters... UAE Projects - Work progress for Job 246 at 14/08/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd... UAE Projects - Work progress for Job 248 at 11/08/2013 : - Over all progress 46.69% - SUB-STRUCTURE WORK 98.8% - MEP WORK 14.19% Ground Floor - Ground Floor Columns 95% - Ground Mezz. 90% - First Floor Slab & Beams 90% First Floor - First floor Columns 84.5% - First Mezz. 41.8% - Roof Slab & Beams 20.5% Ground Floor - Block work 56.4% - Plaster work 1% First Floor - Block work 5.6% Project Details UAE Projects - Work progress for Job 502 at 16/07/2013 : - OVER ALL PERCENTAGE OF WORK COMPLETED - 90.84% - MEP WORKS - 93.08% - ALUMINUM-WORKS - 95.38% - INTERIOR DESIGN-GREEN LINE - 41.38% - JOINERY WORKS - 98% - MARBLE WORKS - 89.01% - CERAMIC WORKS - 98.1% - PAINTING WORKS - 97.14% - HOTEL & SERVICES LIFTS - OTIS - 92.08% Project Derails UAE Projects - Work progress for Job 242 at 15/07/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - 98% of wardrobes works have been completed. - Kitchen cabinet installation are in progress. About 75% of works are completed. - False ceiling in all typical floors have been completed. - Painting works about 85% completed. - Installation of vanity counters... K.S.A. Projects - Work progress for Job#1004 at 14/07/2013 : - Excavation Work 100% - PCC under Footings 100% - Waterproofing for PCC including protections 100% - RCC for Footings 100% - RCC for Neck Columns 100% - Waterproofing for Footings & Neck Columns 100% - Back Filling & Compaction 98% - PCC below Slab on Grade 95% - RCC Concreting for Slab on Grade 92% - External Waterproofing for Retaining Walls 70% - P3 Level verticals & Slab 100% - P2 Level Vertical & Slab 100% - P1 Level Verticals & Slab 100% - G.F. Level Vertical... UAE Projects - Work progress for Job 246 at 13/07/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 247 at 11/07/2013 : RCC Works – 100%. Masonry Works – Block & Plaster works completed 100%. Ceramic Works Painting Works Marble works Ground Floor – 95%. 63.33%. 64%. First Floor – 95%. 50.00%. 56%. Second Floor – 95%. 40.00%. 20%. Roof... UAE Projects - Work progress for Job 248 at 09/07/2013 : Ground Floor Ground Floor Columns 89.6% Ground Mezz. 89.5% First Floor Slab & Beams 80.7% ... K.S.A. Projects - Work progress for Job#1002 at 20/06/2013 : - Supplying and installation of water tanks in progress {(stages 1,2 & 3 are completed) & the last 2 plots in progress from stage 4 } - Boundary wall excavation in progress (stage 1 & 2 completed) & (stage 3 in progress). - Boundary wall/Guard room construction with plaster and painting (stage 1 completed ) & (stage 2 in progress) - MEP works for landscaping (stage 1 completed ) & (stage 2 in progress) - Hard /soft landscaping in progress (stage 1) - Car parking shed/... K.S.A. Projects - Work progress for Job#1001 at 20/06/2013 : - Concrete works completed . - Block works completed - Other finishing Items (plaster , tiles , painting, Aluminum and joinery ) in progress . - Initial handing over completed for (25) plots . - Initial handing over in progress for (25) plots . Project Details UAE Projects - Work progress for Job 502 at 15/06/2013 : - OVER ALL PERCENTAGE OF WORK COMPLETED 90.57%. - MEP WORKS 92.35%. - ALUMINUM-WORKS 95.35%. - INTERIOR DESIGN-GREEN LINE 39%. - JOINERY WORKS 84%. - MARBLE WORKS 88%. - CERAMIC WORKS 95%. - PAINTING WORKS 96.6%. - HOTEL & SERVICES LIFTS – OTIS 90.00%. Project Details UAE Projects - Work progress for Job 242 at 13/06/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminum curtain are completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - 98% of wardrobes works have been completed. - Kitchen cabinet installation are in progress. - False ceiling in all typical floors have been completed. - Painting works about 85% completed. - Installation of vanity counters are completed. - MEP works are in... UAE Projects - Work progress for Job 246 at 12/06/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 247 at 11/06/2013 : RCC Works – 100%. Masonry Works – Block & Plaster works completed 100%. Ceramic Works Painting Works Marble works Ground Floor – 95%. 59.00%. 51%. First Floor – 94%. 50.00%. 49%. Second Floor – 91%. 40%. ... UAE Projects - Work progress for Job 248 at 10/06/2013 : Excavation Work 98.3% PCC under Footings 98.3% Waterproofing for PCC including protections 98.3% RCC for Footings ... K.S.A. Projects - Work progress for Job#1004 at 09/06/2013 : Excavation Work 100%. PCC under Footings 100%. Waterproofing for PCC including protections 100%. RCC for Footings 100%. RCC for Neck Columns 100%. Waterproofing for Footings & Neck Columns 100%. Back Filling & Compaction 95%. PCC below Slab on Grade 90%. RCC Concreting for Slab on Grade 85%. External Waterproofing for Retaining Walls 50%. P3 Level verticals & Slab 100%. P2 Level Vertical & Slab 100%. P1 Level Verticals & Slab 100%. G.F. Level Vertical & Slab 100%. Mezz.... UAE Projects - Work progress for Job 505 at 05/06/2013 : - SUB-STRUCTURE WORKS 100%. - CONCRETE FOR GROUND BEAM 100%. - ANTITERMITE & PCC BELOW G.BEAM 100%. - BITUMEEN FOR G.BEAM 100%. - CONCRETE FOR WATER TANK WALLS 100%. - ANTITERMITE & PCC BELOW SLAB ON GRADE 100%. - CONCRETE FOR SUBSTATION COLOUMNS 100%. - CONCRETE FOR COLUMNS OF ZONE 2 100%. - CONCRETE FOR BEAMS & SLABS @ZONE 5 100%. - BACKFILLING & ROAD BASE TILL GRADE SLAB @ ALL ZONES 100%. - CONCRETE FOR SLAB ON GRADE 85%. - STEEL FIXING & SHUTTERING OF COLUMNS... UAE Projects - Work progress for Job 242 at 16/05/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 97% completed. - Floor and wall ceramic tiles at typical floors are completed. - All doors shutters have been installed. - 95% of wardrobes works have been completed. - False ceiling in all typical floors have been completed. - Painting works about 80% completed. - Installation of vanity counters are completed. - MEP works are in progress. - Testing / commissioning... UAE Projects - Work progress for Job 246 at 14/05/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 247 at 10/05/2013 : RCC Works – 100%. Masonry Works – Block & Plaster works completed 100%. Ceramic Works Painting Works Marble works Ground Floor – 94%. 30.00%. 43%. First Floor – 94%. 23.00%. 36%. Second Floor – 91%. 30%. ... UAE Projects - Work progress for Job 248 at 03/05/2013 : - Excavation Work 98% - PCC under Footings 98% - Waterproofing for PCC including protections 90% - RCC for Footings 85% - RCC for Neck Columns 80% - Waterproofing for Footings & Neck Columns 72% - Back Filling & Compaction 70% - PCC below Slab on Grade 70% - RCC Concreting for Slab on Grade 62% - Ground Floor Columns 45% - Ground Floor Slab & Beams 15% - Roof Floor Slab & Beams 2% Project Description K.S.A. Projects - Work progress for Job#1004 at 21/04/2013 : - Excavation Work 100% - PCC under Footings 100% - Waterproofing for PCC including protections 100% - RCC for Footings 100% - RCC for Neck Columns 100% - Waterproofing for Footings & Neck Columns 100% - Back Filling & Compaction 95% - PCC below Slab on Grade 85% - RCC Concreting for Slab on Grade 75% - P3 Level verticals & Slab 100% - P2 Level Vertical & Slab 100% - P1 Level Verticals & Slab 90% - G.F. Level Vertical & Slab 65% - Mezz. Level # 1 Verticals &... UAE Projects - Work progress for Job 505 at 15/04/2013 : - Excavation 100 % - Compaction 100 % - Placing Road base 100 % - Placing PCC 100 % - footing Concrete 95% - Neck columns Concrete 95% - Bitumen water proofing for footing & Neck columns 50% - Solid Block Work Below Ground Beam 50% Project Details UAE Projects - Work progress for Job 246 at 13/04/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 247 at 09/04/2013 : RCC Works – 100%. Masonry Works – Block works completed 100%. Plaster Works Painting Works Ceramic works Ground Floor – 100%. 20.00%. 94%. First Floor – 100%. 12.00%. 94%. Second Floor – 100%. 0%. 83%. Roof... UAE Projects - Work progress for Job 248 at 03/04/2013 : Excavation Work 88.4% PCC under Footings 79.2% Waterproofing for PCC including protections 78.2% RCC for Footings 75.5% RCC for Neck Columns 75.0% Waterproofing for Footings & Neck Columns 66.4% Back Filling & Compaction 59.4% PCC below Slab on Grade 27.8% RCC Concreting for Slab on Grade 19.7% Ground Floor Columns 16.9% Ground Floor Slab & Beams 0.02% Project Daetails UAE Projects - Work progress for Job 242 at 17/03/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 95% completed. - Floor and wall ceramic tiles about 98% completed. - 98% of the door frames and 96% of doors shutters have been installed. - 95% of wardrobes works have been completed. - False ceiling works about 85% completed. - Painting works about 70% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Testing / commissioning... UAE Projects - Work progress for Job 246 at 16/03/2013 : - Mock Up 100.00% - Raft Zone (1+ 2 + 3) 100.00% - Retaining Wall (From basement to upper) 100.00% - Lower ground (Formwork + rebar + casting concrete) 100.00% - Upper ground (Formwork + rebar + casting concrete) 100.00% - Waterproofing for retaining wall 100.00% - Mezzanine (Formwork + rebar + casting concrete) 100.00% - SPA (Formwork + rebar + casting concrete) 100.00% - 1st Floor (Formwork + rebar + casting concrete) 100.00% - 2nd Floor (Formwork + rebar + casting concrete) 100.00% -... UAE Projects - Work progress for Job 247 at 10/03/2013 : RCC Works – 100%. Masonry Works – Block works completed 100%. Plaster Works Painting Works Ceramic works Ground Floor 98.89%. 20.00%. 83%. First Floor 98.00%. 8.00%. 83%. Second Floor 98.00%. 0%. 47%. Roof Floor 100%.... UAE Projects - Work progress for Job 248 at 06/03/2013 : Excavation: 80% PCC: 65% Footings & Neck Columns casting: 60% Waterproofing for footings: 60% Project Details UAE Projects - Work progress for Job 242 at 16/02/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 95% completed. - Floor and wall ceramic tiles about 98% completed. - 98% of the door frames and 96% of doors shutters have been installed. - 95% of wardrobes works have been completed. - False ceiling works about 85% completed. - Painting works about 70% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Testing / commissioning... UAE Projects - Work progress for Job 246 at 14/02/2013 : - Overall progress percentage 81%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Lower ground level completed 100%. - Upper ground levompleted completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouses (1 & 2) 100%. - Roof 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st... UAE Projects - Work progress for Job 247 at 07/02/2013 : RCC Works – 100%. Masonry Works – Block works completed 100%. Plaster Works Painting Works Ceramic works Ground Floor 97.22%. 15.56%. 5%. First Floor 82%. 6%. 0%. Second Floor 90%. 0%. 0%. Roof Floor... UAE Projects - Work progress for Job 248 at 03/02/2013 : - Casting of Footings at Area 6 in progress-75% - Excavation works @ Areas 2 in progress-90% avg. - PCC works @ Areas 5,6,7,4,3- in progress-95% avg. - PCC works @ Areas 1 - 60% - PCC works @ Areas 2 - 5% - W/P & Screed protection works @ Areas 5,6,7,4,3 in progress- 95% avg. - Shutter & Steel for Area 5 in progress-45% - Shutter & Steel for Area 6 in progress-90% - Shutter & Steel for Area 7 in progress-35% - Solid Block shutter at Area 1 in progress-90% - W/P... UAE Projects - Work progress for Job 242 at 08/01/2013 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 93% completed. - Floor and wall ceramic tiles about 98% completed. - 98% of the door frames and 95% of doors shutters have been installed. - 90% of wardrobes works have been completed. - False ceiling works about 80% completed. - Painting works about 70% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Installation of lifts... UAE Projects - Work progress for Job 247 at 06/01/2013 : RCC Works – 98%. Masonry Works: Block Works Plaster Works Ground Floor 100%. 86%. First Floor 100%. 79%. Second Floor 100%. 2%. Roof Floor 100%. 29%. Gypsum works - 21% MEP Works – 35%. ... UAE Projects - Work progress for Job 243 at 10/12/2012 : - Over All Progress Percentage 97.00% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels completed. - Minarets casting completed -... UAE Projects - Work progress for Job 247 at 06/12/2012 : RCC Works – 98%. Block Works Plaster Works Ground Floor – 98.33%. 61.11%. First Floor – 100%. 29%. Second Floor – 98%. 0%. Roof Floor – 83%. 27%. MEP Works – 19%. The overall work completed as on 31/11/2012... UAE Projects - Work progress for Job 246 at 06/12/2012 : - Overall progress percentage 70%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Lower ground level completed 100%. - Upper ground level completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouses (1 & 2) 100%. - Roof 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st to 9th... UAE Projects - Work progress for Job 242 at 05/12/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 90% completed. - Floor and wall ceramic tiles about 97% completed. - 90% of the door frames and 50% of doors shutters have been installed. - 65% of wardrobes works have been completed. - False ceiling works about 60% completed. - Painting works about 68% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Installation of lifts... نقلاً عن جريدة الخليج - أكد المهندس جمال موحد، : الاثنين ,26/11/2012 أكد المهندس جمال موحد، نائب المدير العام لشركة “اتحاد للهندسة الانشائية”... K.S.A. Projects - Work progress for Job#1002 at 11/11/2012 : - Supplying and installation of water tanks in progress {(stage 1,2 completed) & stage 3& 4 in progress } - Boundary wall excavation in progress (stage 1 completed) . - Boundary wall/Guard room construction with plaster and painting for stage (1) in progress. - MEP works for landscaping in progress. - Hard /soft landscaping in progress (stage 1) - Car parking shed/ Rolling shutter doors installation in progress (stage 1) - Initial handing over in progress for (10) plots Project... K.S.A. Projects - Work progress for Job#1001 at 11/11/2012 : - Concrete works completed . - Block works completed - Other finishing Items (plaster , tiles , painting, Aluminum and joinery ) in progress . - Initial handing over in progress for (10) plots . Project Details K.S.A. Projects - Work progress for Job#1004 at 11/11/2012 : - Mobilization stage is completed. - All foundations/Raft for all zones were completed. - Backfilling works in progress, 80% completed - Columns & Retaining walls for Parking level-3, 100% completed - Parking level-3 slab for Zone-1, 100% completed - Parking level-2 slab for Zone-1 works in progress, 90% completed - Parking level-3 slab for Zone-2 works in progress, 70% completed - Fire water tank up to Parking level-3, 100% completed. - Domestic water tank works in progress,... UAE Projects - Work progress for Job 243 at 27/09/2012 : - Over All Progress Percentage 82.93 % ( Revised according to extra works- Landscape ) - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all... UAE Projects - Work progress for Job 247 at 26/09/2012 : RCC Works – 92%. Masonry Works – Ground Floor - 55%. First Floor - 15%. MEP Works – 4%. Project Details UAE Projects - Work progress for Job 246 at 26/09/2012 : - Overall progress percentage 49%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Lower ground level completed 100%. - Upper ground level completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouses (1 & 2) 100%. - Roof 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st to 9th... UAE Projects - Work progress for Job 240 at 25/09/2012 : - Kitchen Cabinet Fixing in Progress. - Landscape works in Progress - External boundary Wall cladding completed - Soft landscaping works in progress - Internal Finishes in Progress Project Details UAE Projects - Work progress for Job 242 at 25/09/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 85% completed. - Floor and wall ceramic tiles about 95% completed. - 85% of the door frames and 10% of doors shutters have been installed. - 50% of wardrobes works have been completed. - False ceiling works about 45% completed. - Painting works about 60% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Installation of lifts... K.S.A. Projects - Work progress for Job#1004 at 24/09/2012 : - Mobilization stage is completed. - All foundations/Raft for all zones were completed. - 1st slab of zone (1) shall be casted in 5/10/2012 Project Details K.S.A. Projects - Work progress for Job#1002 at 24/09/2012 : - Supplying and installation of water tanks in progress {(stage 1,2 completed) & stage 3 in progress completed } - Boundary wall excavation in progress (stage 1 completed) . - Boundary wall/Guard room construction for stage (1) in progress. - MEP works for landscaping in progress. Project Details K.S.A. Projects - Work progress for Job#1001 at 24/09/2012 : - Concrete works completed . - Block works completed - Other finishing Items (plaster , tiles , painting, Aluminum and joinery ) in progress Project Details UAE Projects - Work progress for Job 502 at 16/08/2012 : - Over All Progress Percentage 74.05% - All Sub-structure and Super-structure works are completed at the project. - Block work at podium in progress with percentage 96% - Block work in typical floors are completed. - Plaster work is completed at office tower, And in progress at hotel tower (Variation 62%),(Podium 66%). - Fair face repairing are in progress with the following percentage (Podium 86%), (Office tower 95%), (Hotel tower 95%) - Ceramic tiles at office tower is completed - Internal... UAE Projects - Work progress for Job 246 at 15/08/2012 : - Overall progress percentage 37%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Lower ground level completed 100%. - Upper ground level completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouses (1 & 2) 100%. - Roof 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st to 8th... Jordan Projects - Work progress for JV#002 at 12/08/2012 : Overall Progress: 34.4 % Wing A 2nd lower floor - Screed works -- on progress 90 % -Painting works -- on progress 25% -Wall Tiles works -- on progress 30 % -Floor Tiles works -- on progress 10 % 1st lower floor - Plastering works -- on progress 95% - Screed works -- on progress 90% -Painting works -- on progress 15% -Wall Tiles works -- on progress 15 % -Floor Tiles works -- on progress 10 % Ground floor - Plastering works -- on progress 85% - Screed... UAE Projects - Work progress for Job 240 at 11/08/2012 : External Wall Cladding and GRC Work Completed up to Floor Level External Painting 100% Internal Marble Work 99% Painting Internal 90% Boundary Wall Stone Cladding 70% Vanity Counter 60% False ceiling 85% Car Parking 100% Stone Floor Paving 40% External Stone Flooring 80% MEP Works 80 % Project Details UAE Projects - Work progress for Job 243 at 09/08/2012 : - Over All Progress Percentage 78.14% ( Revised according to extra works- Landscape ) - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels... UAE Projects - Work progress for Job 237 at 07/08/2012 : - Structural works are completed - Block & Plaster works are completed - Tiling works are completed - Aluminum works are completed - Wardrobes and Kitchen cabinet works are completed - False ceiling works are completed. - Timber door works in progress, 100% completed - Painting works in progress, 90% completed - MEP works in progress, 96% completed - Percentage of work done till end of 06-AUG-2012 is 99%. Project Details UAE Projects - Work progress for Job 247 at 06/08/2012 : - Ground Floor RCC Works 88%. - First Floor RCC Works 76%. - Masonry Works 42.22%. Project Details UAE Projects - Work progress for Job 242 at 04/08/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 75% completed. - Floor and wall ceramic tiles about 93% completed. - 75% of the door frames and 7% of doors shutters have been installed. - 38% of wardrobes works have been completed. - False ceiling works about 43% completed. - Painting works about 55% completed. - Installation of vanity counters are in progress. - MEP works are in progress. - Installation of lifts... UAE Projects - Work progress for Job 246 at 15/07/2012 : - Overall progress percentage 37%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Lower ground level completed 100%. - Upper ground level completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouses (1 & 2) 100%. - Roof 100%.  - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st to 3rd & 4th to 6th + SPA Fl... UAE Projects - Work progress for Job 240 at 09/07/2012 : - Wooden Door fixing in progress - False ceiling painting works are in progress - External painting of GRC is in progress - External Concreting works are in progress - Internal painting in progress Project Details UAE Projects - Work progress for Job 243 at 08/07/2012 : - Over All Progress Percentage 75.13% ( Revised according to extra works- Landscape ) - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels... UAE Projects - Work progress for Job 247 at 07/07/2012 : Ground Floor RCC Works – 74.72%. First Floor RCC Works – 24%. Masonry Works – 2.6%. The overall work completed as on 30/6/2012 is 21%. Project Details UAE Projects - Work progress for Job 237 at 04/07/2012 : - Structural works are completed - Block & Plaster works are completed - Tiling works are completed - Aluminum works are completed - Wardrobes and Kitchen cabinet works are completed - False ceiling works are completed. - Timber door works in progress, 99% completed - Painting works in progress, 90% completed - Percentage of work done till end of 03-JULY-2012 is 98.55%. Project Details UAE Projects - Work progress for Job 242 at 02/07/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 73% completed. - Floor and wall ceramic tiles about 90% completed. - Joinery works as wooden doors and wardrobes are in progress 73% of the door frames have --- been installed & 38% of wardrobes works have been completed. - False ceiling works about 40% completed. - Painting works about 50% completed. - Installation of vanity counters are in progress. - MEP works... UAE Projects - Work progress for Job 246 at 19/06/2012 : - Overall progress percentage 33%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Under ground level completed 100%. - Mezzanine, SPA & 1st Fl to 9th Fl Slab competed 100%. - Penthouse-(1) 100%. - Penthouse-(2) 50%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 100%. - Block work at 1st to 3rd Floor completed 100% - Block work at 4th... UAE Projects - Work progress for Job 242 at 11/06/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 70% completed. - Floor and wall ceramic tiles about 88% completed. - Joinery works as wooden doors and wardrobes are in progress 70% of the door frames have - - been installed & 35% of wardrobes works have been completed. - False ceiling works about 35% completed. - Painting works about 50% completed. - Installation of vanity counters are in progress. - MEP works... UAE Projects - Work progress for Job 247 at 10/06/2012 : - Piling Works 100%. - Foundation RCC Works 100%. - Water Proofing works100%. - Ground Floor RCC Works 36%. Project Details UAE Projects - Work progress for Job 237 at 09/06/2012 : - Structural works are completed - Block & Plaster works are completed - Tiling works are completed - Aluminum works are completed - Wardrobes and Kitchen cabinet works are completed - False ceiling works are completed. - Timber door works in progress, 99% completed - Painting works in progress, 90% completed - Percentage of work done till end of 07-JUNE-2012 is 97.09%. Project Details UAE Projects - Work progress for Job 243 at 07/06/2012 : - Over All Progress Percentage 70.64% ( Revised according to extra works- Landscape ) - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels... UAE Projects - Work progress for Job 240 at 05/06/2012 : - Wooden Door fixing in progress - False ceiling painting works are in progress - External painting of GRC is in progress - External Concreting works are in progress - Internal painting in progress Project Details UAE Projects - Work progress for Job 502 at 05/06/2012 : - Over All Progress Percentage 70.34% - All Sub-structure and Super-structure works are completed at the project. - Block work at podium in progress with percentage 94% - Block work in typical floors are completed. - Plaster work is completed at office tower, And in progress at hotel tower (Variation44%),(Podium 56%). - Fair face repairing are in progress with the following percentage (Podium 76%), (Office - tower 78%), (Hotel tower 64%) - Ceramic tiles at office tower in progress with percentage... صور زيارة صاحب السمو الشيخ الدكتور سلطان بن محمد القاسمي عضو المجلس الأعلى حاكم الشارقة للمبنى الاداري للمركز الاسلامي بالشارقة : Project Details UAE Projects - Work progress for Job 246 at 20/05/2012 : - Overall progress percentage 27%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Under ground level completed 100%. - Upper ground level competed 100%. - Mezzanine, SPA & 1st Fl to 8th Fl Slab competed 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 90%. - Block work at 1st Floor completed 100% -... Jordan Projects - Work progress for (JV#001) at 17/05/2012 : - Over All Progress Percentage 18.04 % - Basements of Annex, Courtyard1, Courtyard2 Completed -Retaining wall & Columns at basement / lower Ground levels completed - Ground floor levels of Annex, Courtyard1 Completed - Vertical elements of Courtyard 2 Completed - Slab of Ground floor of Courtyard 2 in progress with Percentage 80 % - Slab of 32nd floor in progress with Percentage 85 % - Slab of 1st floor in progress with Percentage 75% - Ramps at all levels completed ... UAE Projects - Work progress for Job 242 at 16/05/2012 : - Structure works are completed. - Block works are completed. - External ceramic cladding and aluminium curtain wall about 70% completed. - Floor and wall ceramic tiles about 85% completed. - Joinery works as wooden doors and wardrobes are in progress. - MEP works are in progress. - False ceiling & Paint works are in progress. Project Details UAE Projects - Work progress for Job 247 at 14/05/2012 : The overall work completed 13%. - Piling Works 100%. - Foundation RCC Works 93%. - Water Proofing works 98%. - Ground Floor Columns 7% Project Details Jordan Projects - Work progress for JV#002 at 12/05/2012 : Overall Progress 17.3 % Wing A - Foundation and SOG Works completed - Skelton Works: 2nd lower floor, 1st lower floor, Ground Floor, 1st floor, 2nd floor, and 3rd floor completed. - Skelton Works: Top Roof Works in progress 45 % - Block Works: 2nd lower floor, 1st lower floor, Ground Floor, 1st floor Completed. - Block Work: Second Floor in progress 60 % - Block Work: Third Floor in progress 20 % - Block Work: Parapet of top floor 45 % - Plastering work: 2nd lower floor, 1st... UAE Projects - Work progress for Job 237 at 12/05/2012 : - Structural works are completed - Block & Plaster works are completed - Tiling works are completed - Aluminum works are completed - Wardrobes and Kitchen cabinet works are completed - False ceiling works are completed. - Timber door works in progress, 98% completed - Painting works in progress, 85% completed - Percentage of work done till end of 10-MAY-2012 is 96.54%. Project Details UAE Projects - Work progress for Job 243 at 10/05/2012 : - Over All Progress Percentage 66.3% ( Revised according to extra works- Landscape ) - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels... UAE Projects - Completion of J#230 : UNEC has successfully handed over the Emirati Cluster @ International City Village to its owner M/s. NAKHEEL on timely manner and as scheduled. This cluster is residential and commercial development which consists of 26 Buildings, where in number of total units will reach to 1663 consisting of two types of flats (Studio and One Bedroom). The buildings were designed on an Emirati theme to complement the ‘International Countries’ theme of the Residential District of International City. Project... UAE Projects - Work progress for Job 240 at 01/05/2012 : - Most of the finishes are complete for internal & external areasWooden Door fixing is in progress - False ceiling works are in progress - External Finishes are 99% completed - Landscape works are in progress - Car Park structure completed Project Details K.S.A. Projects - Work progress for Job#1002 at 01/05/2012 : - Supplying and installation of water tanks in progress - Boundary wall excavation in progress Project Details K.S.A. Projects - Work progress for Job#1001 at 01/05/2012 : - Concrete works completed - Block works 80 % - Other finishing Items (plaster , tiles , painting , Aluminum ) in progress Project Details Jordan Projects - Work progress for JV#002 at 01/05/2012 : Wing A: -Foundation and SOG Works completed -Skelton Works: 2nd lower floor, 1st lower floor, Ground Floor, 1st floor, 2nd floor, and 3rd floor completed. -Skelton Works: Top Roof Works in progress 45 % -Block Works: 2nd lower floor, 1st lower floor, and Ground Floor Completed. -Block Work: 1st Floor in progress 80 % -Block Work: Second Floor in progress 20 % -Plastering work: 2nd lower floor, 1st lower floor, and Ground floor in progress 90 % Wing B: -Foundation and SOG Works... UAE Projects - Work progress for Job 502 at 29/04/2012 : - Over All Progress Percentage 67.11% - All Sub-structure and Super-structure works are completed at the project. - RCC Parapets above technical floors are in progress. - Three staircases are casted & completed. - Block work in typical floors are completed. - Block work at podium in progress with percentage 82% - Plaster work in progress (Office tower 89.35%), (Hotel tower (Variation)42.7%),(Podium 20.65%). - Fair face repairing are in progress with the following percentage (Podium... New Project (Riyadh - K.S.A.) : UNEC has been awarded a project for the Construction & Execution of The AL Majdoul Tower– Riyadh, Saudi Arabia Project Details UAE Projects - Work progress for Job 242 at 18/04/2012 : - Structure works are completed. - External ceramic cladding and aluminium curtain wall are in progress. - Joinery works as wooden doors and wardrobes are in progress. - MEP works are in progress. - Floor and wall ceramic tile works 80% completed. - False ceiling works 35% completed. Project Details UAE Projects - Work progress for Job 247 at 18/04/2012 : The Project Scope of works includes the construction & completion of administration Building inside the Islamic Center – Moilah – Sharjah, which has Ground + First Floor + Second Floor. Progress Status: - Piling Works 100%. - Foundation RCC Works 53%. - Water Proofing works 63%. UAE Projects - Work progress for Job 246 at 18/04/2012 : - Overall progress percentage 23%. - Mock up completed 100%. - Raft completed (16000m3) 100%. - Retaining walls completed 100%. - Under ground level completed 100%. - Upper ground level competed 100%. - Mezzanine, SPA & 1st Fl to 6th Fl Slab competed 100%. - Ramps 1, 2 3, 4, 5 & 6 completed 100%. - Block work basement & lower ground & upper ground 100%. - Block work at Mezzanine completed 80%. - Block work at 1st Floor completed 60% - Plaster work basement, lower ground... UAE Projects - Additional work added to the SHEIKH ZAYED MOSQUE : Additional work added to the project, the total amount 16,548,300 DHS for the external works and revised completion date will be 14/11/2012 Project Details UAE Projects - Work progress for Job 237 at 01/04/2012 : - Structural works are completed - Block & Plaster works are completed - Tiling works are completed - Aluminum works are completed - Wardrobes and Kitchen cabinet works are completed - False ceiling works are completed. - Timber door works in progress, 95% completed - Painting works in progress, 85% completed - Percentage of work done till end of MAR-2012 is 96.05%. Project Details New Project (Abu Dhabi - U.A.E.) : has been awarded a AED, 257,220,000.00 project (~ $ 70.2 M) for the Construction & Execution of The Arjaan Rotana – Capital Center – Plot No. C14 – Abu Dhabi (ADNEC Plot No. B07/08) – Sector W59/01. Project Details UAE Projects - Work progress for Job 243 at 01/04/2012 : - Over All Progress Percentage 67.75% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels completed. - Minarets casting completed -... الزعابي لـ "الخليج": اكتمال إنشاء مسجد الشيخ زايد بالفجيرة خلال نوفمبر : أعلن أحمد جمعة الزعابي نائب وزير شؤون الرئاسة رئيس لجنة متابعة مبادرات صاحب السمو الشيخ... UAE Projects - Work progress for Job 246 at 15/02/2012 : - overall progress percentage 19% - Mock up complete 100% - Raft Completed (16000m) 100% - Retaining walls completed 100% - Under ground level completed 100% - Upper ground level completed 100% - Mezzanine SPA & 1 st Floor slab completed 100% - Block work in progress (basement 70% & lower ground 40%) - Ramps 2,3,5&6 completed 100% - Ramps 1&4 in progress - Mep work in progress نقلاً عن جريدة الاتحاد إنجاز 55% من مسجد الشيخ زايد الجديد بالفجيرة : السيد حسن (الفجيرة) - أكد راشد عبيد العبيد مدير مكتب الهيئة العامة للشؤون الإسلامية والأوقاف... UAE Projects - Work progress for Job 243 at 12/02/2012 : - Over All Progress Percentage 57.50% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels completed. - Minarets casting completed -... UAE Projects - Work progress for Job 237 at 01/02/2012 : - Structural works are completed - Block & Plaster works are completed. - Tiling works are completed. - Aluminum works are completed. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. 98% completed. - Percentage of work done till end of JAN-2012 is 88.75%. Project Details UAE Projects - Work Progress for Job#243 till 21/01/2012 : - Over All Progress Percentage 55.25% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels completed. - Minarets casting completed -... UAE Projects - Work Progress for Job#237 till 01/01/2012 : - Structural works are completed - Block & Plaster works are completed. - Tiling works are completed. - Aluminum works are completed. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. 98% completed. - Percentage of work done till end of DEC-2011 is 90.10%. Project Details UAE Projects - Work Progress for Job#243 till 01/01/2012 : - Over All Progress Percentage 51.43% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress completed - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyard completed - Slabs at all levels completed. - Minarets casting completed -... زيارة الشيخ محمد بن زايد مشروع مسجد الشيخ زايد في إمارة الفجيرة : في 4 ديسمبر قام الفريق أول سمو الشيخ محمد بن زايد آل نهيان ولي عهد أبوظبي نائب القائد الأعلى... UAE Projects - Work progress for Job 242 at 30/11/2011 : Civil Works - Structural works have been finished – 100% - Internal finishing as follow: - Wall ceramic tiles for wet area – 60% - Block & Plaster works – 90% - Floor ceramic tiles works – 30% - Aluminium works – 40% - External ceramic cladding -10% - Lifts have been delivered and expected next w3eek to start the works. Electrical Works - Busbar works – 80% finished. - Fixing LV Panel – 80% Mechanical Works - Chillers... New Project (Sharjah - U.A.E.) : has been awarded a 89,000,000.00 AED project for the Construction of The Islamic Center Administration Building – Sharjah UAE – Plot No. 966/D-966/E – Muwailah Sharjah. Project Details UAE Projects - Work progress for Job 230 at 31/07/2011 : The Project Scope of works includes the construction of 26 no’s G+4 Residential & commercial buildings at International city Dubai. The project is phased in to 4 Zones. Zone 1 – 5 Buildings Zone 2– 7 Buildings Zone 3 – 8 Buildings Zone 1 – 6 Buildings 5 Buildings are completed in Zone 1 and the final painting works are under progress. For the remaining Zones finishing and MEP works are in progress. The overall work completed... UAE Projects - Work progress for Job 237 at 31/07/2011 : - Structural works are completed - Block & Plaster works are completed. - Tiling works in progress, 99% completed. - Aluminum works in progress, 75% completed. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. - Percentage of work done till end of JULY-2011 is 74.71%. Project Details UAE Projects - Work progress for Job 243 at 30/05/2011 : 1- Progress Percentage 31.60% 2- Slab at level 19 in progress with Percentage 50% 3- Grade slab in progress at courtyardwith Percentage 97% 4- Columns from 10 to 19 m level in progress with Percentage 90% 5- Columns at Courtyard in progress with Percentage 65% 6- Columns from 19 - 22 m level in progress with Percentage 5% 7- Arches, Beams & slabs At courtyard in progress with Percentage 15% 8- Block work at Lower Ground level in progress with Percentage... UAE Projects - Work progress for Job 237 at 30/05/2011 : - Structural works are completed - Block & Plaster works are completed. - Tiling works in progress, 95% completed. - Aluminum works in progress, 60% completed. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. - Percentage of work done till end of May-2011 is 68.79% Project Details UAE Projects - Work progress for Job 238 at 30/05/2011 : The project consists of 6 Buildings & Basement Parking + Swimming Pool. - Buildings (C, D, E & F) are 95% Completed. - Buildings (A & B) 85% Completed. - External Parking and Paving 80% is Completed. - (M) Building (Parking + Swimming Pool) 80% is completed. - Handing Over date of Project is 16/06/2011 Project Details UAE Projects - Work progress for Job 246 at 25/05/2011 : - Mobilization 100% - Leveling & Compaction 80% - Anti Termite Zone 80% - PCC Casting Zone 80% Damac Properties awards main contract in (Amman - Jordan) : Luxury developer Damac Properties has announced it has awarded the main construction contract for the completion of its projects in Amman, Jordan to United Engineering Construction (UNEC) and El Concorde Construction. The joint venture between United Engineering Construction (UNEC) and El Concorde Construction will see them complete Damac Properties' Jordan developments, which include the Heights, Lofts at the Heights and The Courtyard 1 & 2. "Main works will recommence at the site immediately,... UAE Projects - Work progress for Job 502 at 05/03/2011 : Arjaan rotana capital center plot c14 Duration Details - Contract Period: 808 Days - Commencement Date: 4-Apr-10 - Completion Date: 20-Jun-12 Building Details ... UAE Projects - Work progress for Job 230 at 05/03/2011 : The Project Scope of works includes the construction of 26 no’s G+4 Residential & commercial buildings at International city Dubai. The project is phased in to 4 Zones. Zone 1 – 5 Buildings Zone 2– 7 Buildings Zone 3 – 8 Buildings Zone 1 – 6 Buildings 2 Buildings are completed in Zone 1 and the external paving works are under progress. For the remaining Zones finishing and MEP works are in progress. The overall work completed... New Project (Ajman - U.A.E.) : has been awarded a AED, 250,000,000.00 project for the Construction & Execution of The Bab AL Bahr a Luxury Collection Hotel – Ajman UAE – Plot No. 44 – Al Nakheel Area UAE Projects - Work progress for Job 232 at 21/02/2011 : The project consists of The Diamond (2B+G+16+2Mec) Floors on R5-22 plot #: 682-1295 at Dubai Sport City for M/s. The First Group. The building consists of (2 Basement + Ground + 16 Floors + 2 Mechanical Floors) : Client: M/s. The First Homes Limited Tel. - 04 4097500, Fax - 04 4097600 Dubai, U. A. E. Consultant: M/s. Badri & Bensouda Architectural & Engineering Consultants P. O. Box - 53363, Dubai, U.A.E. ... UAE Projects - Work progress for Job 219 at 21/02/2011 : The project is titled ‘Construction of (B + G + 14 + R) Residential Building on plot no. 682-1306 (R5-P.23)’ at Dubai Sports City for Mr. Abdul Rahman Mohammad Taher Mohammad Wali & Mr. Abdul Halim Muwahid. Client : Mr. Abdul Rahman Mohammad Taher Mohammad Wali and Mr. Abdul Halim Muwahid P.O. Box – 96 Dubai, U.A.E. Consultant : M/s. QHC Architects, Engineers P. O. Box – 2089, Dubai, U.A.E. ... UAE Projects - Work progress for Job 210 at 21/02/2011 : The project consists of 5 Nos. Residential Buildings on plot nos. (R5-P.3 (plot no 682-1278), R5-P.25 (plot no 682-1299), R5-P.26 (plot no 682-1300), R5-P.27 (plot no 682-1301) & R5-P.28 (plot no 682-1302)) @ Dubai Sports City for M/s. FALAK properties. Building No. (P.25 – Golf Tower) :- The building consists of (1 Basement + Ground + 14 Floors). Building No. (P.26 – Cricket Tower) :- The building consists of (2 Basement + Ground + 14 Floors). Building No. (P.27 – Tennis... UAE Projects - Work progress for Job 237 at 21/02/2011 : - Structural works are completed - Block & Plaster works expected to be completed on 15/03/2011. - Tiling works at 8th floor. - Aluminum works in progress. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. - Percentage of work done till end of Feb-2011 is 47.62% Project Details UAE Projects - Work progress for Job 243 at 21/02/2011 : - Progress Percentage 26.73% - Footings & Raft foundation completed at main mosque - Footings Completed at courtyard - Retaining wall & Columns at basement / lower Ground level completed - Columns at Ground floor level in progress with Percentage 70% - Piles completed for Minarets - Ground Floor Slab completed at main mosque - Hollow Core slab completed at main mosque - Grad slab in progress at courtyardwith Percentage 70% - Arches in at Ground floor level in progress with... UAE Projects - Work Progress for Job#234-B till 14/02/2011 : PROJECT INFORMATION: Project: Construction of Phase 2 – Canal Residential West Spanish (2B+G+11+R), Arabian (2B+G) Floor on plot NO. R8-13 (682-1403) at Dubai Sports City Contractor: M/S United Engineering Construction (UNEC)LLC Client: M/S Dubai Sport City Consultant: M/S Local Engineering Offices (LEO) Project Value=170,000,000.00/-Dhs Progress Status: (Phase-2) - Shoring Work Completed. - Waterproofing for substructure completed. - Raft work completed. - Retaining wall... UAE Projects - Work Progress for Job#234-A till 14/02/2011 : PROJECT INFORMATION: Project: Construction of Phase 1 – Canal Residential West Mediterranean (2B+G+11), European (2B+G+11) & Venetion (3B+G+19) Floor Building on plot NO. R8-14 (DM id 682-1402) at Dubai Sports City Contractor: M/S United Engineering Construction (UNEC)LLC Client: M/S Dubai Sport City Consultant: M/S Local Engineering Offices (LEO) Project Value=516,000,000.00/-Dhs Progress Status: (Phase-1) - The Progress Percentage equal 81%. - Substructure and Superstructure... UAE Projects - Work progress for Job 238 at 14/02/2011 : PROJECT INFORMATION: Project: Construction & Completion of 12 Buildings (G+7) @ Al Moiuleh Sharjah UAE Client: Mr. Sheikh Mohammad Al Qassimi Consultant: M/s.Gulf International - The project consists of 6 Buildings & Basement Parking + Swimming Pool. - Buildings (E & F) are 95% completed. - Buildings (C & D) 85% completed. - Buildings (A & B) block work is completed and internal & external wall tiles on progress. - (M) Building (Parking + Swimming Pool)... UAE Projects - Work progress for Job 243 at 18/01/2011 : Progress Percentage 20.12% Footings & Raft foundation completed at main mosque Footings Completed at courtyard Retaining wall & Columns at basement / lower Ground level completed Columns at Ground floor level in progress with Percentage 5% Piles completed for Minarets Ground Floor Slab in progress with percentage 80% Hollow Core slab in progress with Percentage 70% Grad slab in progress at courtyard project Details UAE Projects - Work progress for Job 237 at 25/12/2010 : PROJECT INFORMATION: - Time Status: Completion Date 17-MAR-10 Project Duration 301 - Structural works expected to be completed on 15/1/2010. - Block & Plaster works expected to be completed on 30/1/2011. - Tiling works at 8th floor. - Aluminum works in progress. - Other finishing items such as (Joinery, False ceiling, Painting works, etc..) in progress. - Authorities approval from DEWA on the Electrical shop drawings supply to be expected on 30/1/2011 ... UAE Projects - Work progress for Job 502 at 15/12/2010 : Duration Details - Contract Period 808 Days - Commencement Date 4-Apr-10 - Completion Date 20-Jun-12 Building Details - Total built up area 58889 m2 - 4 Basement Floors for Parking & 3 Floors Podium Area - Hotel Tower Typical Floors (3rd Floor to 25th Floor) - Office Tower Typical Floors ( 3rd Floor to 25th Floor) Construction activities (November-10): Concrete Pouring for Basement 2 & Basement 1... UAE Projects - Work progress for Job 243 at 11/12/2010 : PROJECT INFORMATION: -Time Status: Commencement Date 09-May-10 Completion Date 17-Jul-12 Project Duration 800 -Progress PERCENTAGE: 16.56% -Structural work will be completed: 03 / 11 / 2011 -Progress & work Status for the major activities: Excavation 100% Raft foundation 100% Pilling works 100% Retaining Wall 90% Ground Floor slab In progress Project Details UAE Projects - Work progress for Job 238 at 11/12/2010 : The project consists of 6 Buildings & Basement Parking + Swimming Pool , Raft Foundation completed and Structural work completed,Buildings (E & F) are 90% work completed,Buildings (C & D) internal plaster and wall tiles completed and tiles for floor on progress,Buildings (A & B) only block work is in progress,(M) Building (Parking + Swimming Pool): Structural, block & internal plaster work completed and Handing over of project: 16/06/2011. Project Details Attending International Labor Day : UNEC attending International Labour Day - Occupational Safety Day on Sunday 02/05/2010 at Za'abeel Hall Dubai Municipality Club. المقاولات تتنفس الصعداء مع حركة دوران أموال السداد : قال المهندس جمال موحد نائب المدير العام في شركة "اتحاد الهندسة الإنشائية"(يونك) إن الانتهاء... المقاولون يرحبون: تسوية الديون تعزز السيولة وتطلق مشاريع مجدداً : قال المهندس جمال موحد نائب المدير العام شركة "اتحاد الهندسة الإنشائية" (يونك) : "يسعدنا... العقارية توقع عقدين لإنشاء المرحلة الأولى والثانية من مشروع الحي الدبلوماسي : قامت الشركة العقارية السعودية في يوم الأربعاء الماضي الموافق 14/07/2010 بترسية عقد إنشاء المرحلة...

PROJECT 

 |

       Back


 
(Job#219)Residential Tower "

Plot No.
:
R5-23 at Dubai Sports City
Location
:
Dubai – U.A.E
Project Details
Employer
:
Mr. Abdul Halim A. Rahim Muwahid & Mr. Abdul Rahman M. Tahir Mohammed Wali
Consultant
:
M/s. QHC Architects & Engineers
Total Value
:
49,747,305 Dhs.
Total Built Up Area
 
                       Sq. Ft.
Completion Period
:
509 Days Including Mobilization
Completion Date
:
14-May-2009

 

All Events:

Work progress for Job 219 at 21/02/2011


Building Resi/commercial